• info@wardtrading.site
  • 00971502505580 - 00971566699565

Project Overview

The project involves the development of a fully integrated copper cathode production facility with a purity level of 99.99%, designed in accordance with international industrial and environmental standards. The plant is based on advanced hydrometallurgical and electrolytic refining processes, ensuring high efficiency, consistent product quality, and optimized operational performance.

The scope of the project includes raw material handling, crushing and grinding systems, leaching processes, solvent extraction (SX), electrowinning (EW), and cathode stripping and handling systems. The facility is engineered to maximize metal recovery rates while minimizing energy consumption and environmental impact through the implementation of modern control systems and sustainable process technologies.

This project aims to support the growing demand for high-grade copper in global markets, particularly in the electrical, construction, and renewable energy sectors, positioning the facility as a reliable source of premium-quality copper cathodes


Project Detail

  • Client Name:
    Aliaga, Turkey
  • Client Company Name:
    ETS GROUPE FABRICE MINING
  • Project Start Date:
    07-Aug-2024
  • Project End Date:
    01-Jan-2026
  • Client Comment:

Quick Contact

Recent Portfolio

See all our works that we do for our clients

Do you want to get our quality service for your business?